Construction Timeline

As of 3/8/16, the entire floor has been installed and over half of the walls have been poured into forms. We expect all of the walls to be lifted up and in place in about three weeks and the entire structure to be under roof in May. The construction company has worked hard and done a great job staying on schedule. We look forward to moving in to our new facility this summer. (Click any photo to enlarge). Click here to see the video section.

2 stage 1      3 stage 2      DSCF0329
 
 4 stage 3  5 stage 4  6 stage 5
 
The first wall panel was installed on 4/4/16. The construction company expects to install all 107 such wall panels over the next 6-7 days. Construction is progressing at an excellent pace.
IMG_2465(1) IMG_2465(1) IMG_2465(1)
 
IMG_2465(1) IMG_2465(1) IMG_2465(1)
 
IMG_2465(1) IMG_2465(1) IMG_2465(1)
 
IMG_2825
 
IMG_2826 IMG_2824 20160429_125756
 
20160429_125433 20160429_133848 20160429_132114
 
20160429_131910 20160429_130527 20160429_130427
 
IMG_3047 FullSizeRender IMG_2999

Videos
Share this pageShare on FacebookTweet about this on TwitterShare on LinkedInShare on Google+